Suite 101, Level 1/518 Little Bourke St, Melbourne VIC 3000
Monday - Friday 8am-5pm
(03) 9614 1645

Aldi

Project Detailsx

Client: Aldi

Caroline Springs

Epping Plaza

Wyndham Vale

Eden Rise, Berwick

South Melbourne

Wellington Village

Mooroopna

Greensborough

Sanctuary Lakes

Eaglehawk

Moonee Ponds

Carnegie

Springvale South

Forest Hill Chase

Somerville

Craigieburn

Woodgrove

Northland

Altona North

Wallan

Lavington

Mentone

Cowes

Epsom Village

Traralgon

Wendouree

Peninsula Centre, Mornington

Kilmore

The Pines Extension

Chirnside Park Extn.

Carrum Extn.

Hastings

Altona Gate

Endeavour Hills Extn.

Highton Extn.

Airport West Extn.

Mordialloc Extn.

Pacific Epping Extn.

Warragul Extn.

Keilor Central Extn.

Gladstone park

Moorabbin Airport Extn.

Gateway Plaza, Warrnambool

Leopold

Camberwell

Aurora

Tarneit Central

The Glen

Dandenong Plaza

Cheltenham

Project Overviewx

 

In the modern industrialized world, construction usually involves the translation of designs into reality. A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants. The design team is most commonly employed by (i.e. in contract with) the property owner. Under this system, once the design is completed by the design team, a number of construction companies or construction management companies may then be asked to make a bid for the work, either based directly on the design, or on the basis of drawings and a bill of quantities provided by a quantity surveyor. Following evaluation of bids, the owner typically awards a contract to the most cost efficient bidder.